Directory / gateway.pipeworx.io
Boston Calendar working
https://gateway.pipeworx.io/boston-calendar/mcp
Before you connect
- Advice
caution_tools_changed- Protocol
- mcp · streamable-http
- Server
- pipeworx-gateway 0.1.0 · 46 tools
- Last check
- 3 h ago · 42 ms · HTTP 200
- Detail
- initialize ok, protocol 2025-06-18
Reliability
- Uptime 24 h
- 100.0% (8 checks)
- Uptime 7 days
- 100.0% (47 checks)
- Uptime, 8 days observed
- 100.0% (signed daily)
- Listed by
- mcp-registry
- First seen by alalanet
- 2026-11-05 22:33 UTC
Trust Score
65 of 80
Open formula: /trust. Recomputed once a day from what alalanet observed and its sources publish; nothing here can be bought.
tools_changed_recently— tools were added or redefined in the last 7 days, or changed in a way alalanet could not compare in full (−5).
Description (from the catalogue, unverified)
The Boston Calendar MCP.
Signed history
| When | Statement | Log index |
|---|---|---|
| 2026-11-14 00:13 UTC | 70eed6d5…e9133e daily summary | 668713 |
| 2026-11-13 00:10 UTC | f68eac59…6f8bc3 daily summary | 591656 |
| 2026-11-12 06:13 UTC | 07132980…1513d6 tool-set change | 571275 |
| 2026-11-12 00:13 UTC | 8b969ff5…5d68bb daily summary | 513664 |
| 2026-11-11 00:13 UTC | 4c7f4698…0afc3b daily summary | 433418 |
| 2026-11-10 21:39 UTC | 1ae49617…d66acc tool-set change | 419538 |
| 2026-11-10 00:13 UTC | 20502e53…e79759 daily summary | 350218 |
| 2026-11-09 00:11 UTC | d331a240…a596b5 daily summary | 259344 |
| 2026-11-08 00:08 UTC | 2281cb6c…afcbe0 daily summary | 180734 |
| 2026-11-07 00:11 UTC | b7eaca8b…3e23ec daily summary | 101286 |
Verify any statement offline: how.
For agents and owners
JSON: https://alalanet.com/v1/services/a5hp7jbkghqmjje3
Badge:
<a href="https://alalanet.com/s/a5hp7jbkghqmjje3"><img src="https://alalanet.com/badge/a5hp7jbkghqmjje3" alt="alalanet status"></a>
Own this service? Claim it (free). Do not want it checked? See the prober page.